Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.
Zhejiang, China
Diamond Member Since 2010
Audited Supplier
Manufacturer/Factory & Trading Company
Sample Available
OEM/ODM Service
Factory Tour
Injection TPE TPR Car Foot Mat Mould
Reference FOB Price: | US $9,000.00-15,000.00 / Set |
---|---|
Min. Order: | 1 Set |
Shaping Mode: | Injection Mould |
---|---|
Surface Finish Process: | Polishing |
Mould Cavity: | Single Cavity |
Plastic Material: | PVC |
Process Combination Type: | Single-Process Mode |
Application: | Car |
Basic Info
Model NO.
JSL-N0920-3
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
ISO
Standard
DME
Customized
Customized
Mould Standard
Dme
Mould Quality Control
in House Professional QC
Mould Cooling System
by Experienced Designer
Mould Base
S50c
Transport Package
Wooden Crate
Specification
Dme
Trademark
JSLMOULD
Origin
Huangyan, Taizhou, China
HS Code
8480719090
Production Capacity
300 Sets/Year
Product Description
Product Name | Injection TPE TPR Car Foot Mat Mould |
Product material | PVC |
Core& Cavity Steel | 1.2738 |
Steel hardness: | HRC34-38 |
Mould Standard | DME |
Cavity Number | ONE |
Injection System | Three plate |
Ejector System | Ejector pin |
Cycle Time | According to the product |
Tooling lead time | 40-70 days |
Mould life | 1, 000, 000 times |
Quality assurance | ISO9001 |
Our Advantage | 1. High quality |
2. Reasonable price | |
3. On time delivery | |
4. Good After-sale service | |
5. Strict quality control | |
6. All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.
FAQ:
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.