China Quality Plastic Refrigerator Fridge Crisper Drawer Mould
1. Offer mould core, cavity steel certificate
2. Offer mould trial video, good after-service
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
For more information, please contact with us freely.
Product Name |
China Quality Plastic Refrigerator Fridge Crisper Drawer Mould |
Product material |
PC |
Core&Cavity Steel |
2738/718 |
Steel hardness |
HRC35-38 |
Mould Standard |
DME |
Cavity Number |
1 |
Injection System |
direct gate(hot runner) |
Ejector System |
ejector pin |
Cycle Time |
35'' |
Tooling lead time |
60days |
Mould life |
500,000shots |
Quality assurance |
ISO9001 |
|
Our Advantage |
1.High quality |
2.Reasonable price |
3.On time delivery |
4.Good After-sale service |
5.Strict quality control |
6.All the mould are automotic. |
|
Offer you |
In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
In-time communication on the technical points |
In-time sending pictures for the mould machining progress and mould finishing schedule |
In-time mould test and sample delivery |
In-time mould delivery. |
|
|
Processing |
Time |
Prepare Steel |
5 days |
CNC Machining |
10 days |
Drill |
8 days |
Heat treatment |
6 days |
High speed CNC Machining |
7 days |
Assembling and Fitting |
6 days |
Polishing |
6 days |
T1 mould test |
2 days |
1. Samples/Drawing & Requirement from you |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. |
3. Material Purchase: Steel cutting and Mould base tooling. |
4. Assembling. |
5. Inspection of mould: following and controlling the tooling processing. |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! |
7. Your instruction & confirmation for shipment. |
8. Ready made mould before packing. |