plastic tote boxes with hinged lids mould manufacturer
1. Yudo hot runner for mould
2. Good cooling system
3. Reliable qualtiy
4. On time delivery
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name |
Injection mould for Plastic Tote Box with Hinged Lid |
Product material |
PP |
Core& Cavity Steel |
718 |
Steel hardness: |
HRC34-38 |
Mould Standard |
DME |
Cavity Number |
1*1 |
Injection System |
Point gate |
Ejector System |
Stripper Plate |
Cycle Time |
30~40S |
Tooling lead time |
60 days |
Mould life |
500, 000Shots |
Quality assurance |
ISO9001 |
|
Our Advantage |
1. High quality |
2. Reasonable price |
3. On time delivery |
4. Good After-sale service |
5. Strict quality control |
6. All the mould are automotic. |
|
Offer you |
In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
In-time communication on the technical points |
In-time sending pictures for the mould machining progress and mould finishing schedule |
In-time mould test and sample delivery |
In-time mould delivery. |
|
For more information please contact us.
|