Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name |
High Quality Experienced Customized Plastic RO Water Purifier Mould |
Product material |
pp/pc |
Core&Cavity Steel |
718 |
Steel hardness |
HRC35-38 |
Mould Standard |
DME |
Cavity Number |
1 |
Injection System |
side gate |
Ejector System |
ejector pin |
Cycle Time |
30 s |
Tooling lead time |
60 days |
Mould life |
500,000 |
Quality assurance |
ISO9001 |
Our Advantage |
1.High quality |
2.Reasonable price |
|
3.On time delivery |
|
4.Good After-sale service |
|
5.Strict quality control |
|
6.All the mould are automotic. |
|
Offer you |
In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
|
In-time communication on the technical points |
|
In-time sending pictures for the mould machining progress and mould finishing schedule |
|
In-time mould test and sample delivery |
|
In-time mould delivery. |
|
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1.Samples/Drawing &Requirement from you | |
2.Mould design:we will Communicate&Exchange the opinion with you after you place order. | |
3.Material Purchase:Steel cutting and Mould base tooling. | |
4.Assembling. | |
5.Inspection of mould : following and controlling the tooling processing. | |
6.Mould testing:We will inform you the date.Then will send the sample's inspection report&injection parameters with the sample to you! | |
7.Your instruction &confirmation for shipment. | |
8.Ready made mould before packing. |