Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Customized Quality Plastic Supermarket Shopping Basket Mold |
Product material | PP |
Core& Cavity Steel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME |
Cavity Number | 1*1 |
Injection System | Direct gate |
Ejector System | ejector pin |
Cycle Time | 40-50S |
Tooling lead time | 60 days |
Mould life | 500, 000 |
Quality assurance | ISO9001 |
Our Advantage | 1. High quality |
2. Reasonable price | |
3. On time delivery | |
4. Good After-sale service | |
5. Strict quality control | |
6. All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 day |
1.Samples/Drawing &Requirement from you | |
2.Mould design:we will Communicate&Exchange the opinion with you after you place order . | |
3.Material Purchase:Steel cutting and Mould base tooling. | |
4.Assembling. | |
5.Inspection of mould : following and controlling the tooling processing. | |
6.Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you! | |
7.Your instruction &confirmation for shipment. | |
8.Ready made mould before packing. | |
For more information please contact us. |