JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
For more information, please contact with us freely.
| Product Name |
Pigeon Crate MOULD |
| Product material |
pe |
| Core& Cavity Steel |
718/2738/p20/h13 |
| Steel hardness: |
HRC34-38 |
| Mould Standard |
DME |
| Cavity Number |
ONE |
| Injection System |
HOT Runner -4 drops-direct gate |
| Ejector System |
EJECTOR PLATE |
| Cycle Time |
40 SECOND/SHOT |
| Tooling lead time |
60 days |
| Mould life |
500, 000 times |
| Quality assurance |
ISO9001 |
| |
| Our Advantage |
1. High quality |
| 2. Reasonable price |
| 3. On time delivery |
| 4. Good After-sale service |
| 5. Strict quality control |
| 6. All the mould are automotic. |
| |
| Offer you |
In-time response on letters, telephone calls or fax |
| In-time supply the quotation and mould designs |
| In-time communication on the technical points |
| In-time sending pictures for the mould machining progress and mould finishing schedule |
| In-time mould test and sample delivery |
| In-time mould delivery |
| |
| For more information please contact us. |
| Processing |
Time |
| Prepare Steel |
5 days |
| CNC Machining |
10 days |
| Drill |
8 days |
| Heat treatment |
6 days |
| High speed CNC Machining |
7 days |
| Assembling and Fitting |
6 days |
| Polishing |
6 days |
| T1 mould test |
2 days |
| 1. Samples/Drawing & Requirement from you |
| 2. Mould design: we will Communicate& Exchange the opinion with you after you place order. |
| 3. Material Purchase: Steel cutting and Mould base tooling. |
| 4. Assembling. |
| 5. Inspection of mould: following and controlling the tooling processing. |
| 6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! |
| 7. Your instruction & confirmation for shipment. |
| 8. Ready made mould before packing. |