JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.
Product Name |
Injection Plastic Helmet Lens Visor Mould |
Product material |
PC |
Core& Cavity Steel |
S136 |
Steel hardness: |
HRC48-52 |
Mould Standard |
DME |
Cavity Number |
1*1 |
Injection System |
side gate |
Ejector System |
ejector blade |
Cycle Time |
30s |
Tooling lead time |
60 days |
Mould life |
500, 000shots |
Quality assurance |
ISO9001 |
|
Our Advantage |
1. High quality |
2. Reasonable price |
3. On time delivery |
4. Good After-sale service |
5. Strict quality control |
6. All the mould are automotic. |
|
Offer you |
In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
In-time communication on the technical points |
In-time sending pictures for the mould machining progress and mould finishing schedule |
In-time mould test and sample delivery |
In-time mould delivery. |
For more information please contact us. |
Processing |
Time |
Prepare Steel |
5 days |
CNC Machining |
10 days |
Drill |
8 days |
Heat treatment |
6 days |
High speed CNC Machining |
7 days |
Assembling and Fitting |
6 days |
Polishing |
6 days |
T1 mould test |
2 days |