Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Still deciding? Get samples of US$ 50/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
product Name | Professional Custom 100 L Swing Lid Plastic Waste Bin Mold |
Product material |
pp |
Core&Cavity Steel |
718/2738 ect |
Steel hardness |
HRC35-38 |
Mould Standard |
DME |
Cavity Number |
1 |
Injection System |
side gate |
Ejector System |
ejector pin |
Cycle Time |
30 s |
Tooling lead time |
60 days |
Mould life |
500,000 |
Quality assurance |
ISO9001 |
Our Advantage |
1.High quality |
2.Reasonable price |
|
3.On time delivery |
|
4.Good After-sale service |
|
5.Strict quality control |
|
6.All the mould are automotic. |
|
Offer you |
In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs |
|
In-time communication on the technical points |
|
In-time sending pictures for the mould machining progress and mould finishing schedule |
|
In-time mould test and sample delivery |
|
In-time mould delivery. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. |