• Plastic Book Storage Crate Mould
  • Plastic Book Storage Crate Mould
  • Plastic Book Storage Crate Mould

Plastic Book Storage Crate Mould

Shaping Mode: Injection Mould
Surface Finish Process: Polish or Texture
Mould Cavity: Single Cavity
Plastic Material: HDPE
Process Combination Type: Single-Process Mode
Application: Home Use
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Rating: 4.0/5
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
JSL-T1785-12
Runner
Cold/Hot
Design Software
Ug,PRO-E,Solidwork
Installation
Fixed
Certification
ISO
Standard
Dme/Hasco/Lkm Ect
Customized
Customized
Mould Standard
S50c/C45
Heat Treatment
Nitriding
Machine Equipment
CNC,EDM,Wire Cutting Machine,Drilling/Grinding
Mould Cooling System
by Experienced Designer
Mould Quality Control
by Professional QC in House Machine
Mould Operating Mode
Automatically by CNC
Mould Design
7days
Mould Report
7-10days Per Time
T1 Time
50days
Aftersale
Yes
Transport Package
Wooden Crate
Specification
AS Requirement
Trademark
JSLMOULD
Origin
Taizhou, China
HS Code
8480719090
Production Capacity
500 Sets Molds/Year

Product Description

Product Name Plastic Book Storage Crate Mould
Product material HDPE
Core& Cavity Steel 2738
Steel hardness: HRC35-38
Mould Standard DME
Cavity Number ONE
Injection System direct gate, hot runner system
Ejector System Ejector plate
Cycle Time 45s
Tooling lead time 60  days
Mould life 1, 000, 000 times
Quality assurance ISO9001
Our Advantage 1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.
Offer you In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
  For more information please contact us.
 
rocessing Time
Prepare Steel 5 days
CNC Machining 10 days
Drill 8 days
Heat treatment 6 days
High speed CNC Machining 7 days
Assembling and Fitting 6 days
Polishing 6 days
T1 mould test 2 days
1. Samples/Drawing & Requirement from you
2. Mould design: we will Communicate& Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling. 
4. Assembling.
5. Inspection of mould: following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you!
7. Your instruction & confirmation for shipment.
8. Ready made mould before packing.


JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- checking each part of mould's size after machining, according to 2D drawing

- mould testing(check mould running condition)

3. Check with customer's requirement again before mould shipping.
For more information, please contact with us freely.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now