New Plastic Injection Drain Box Mould

Product Details
Customization: Available
Warranty: 1 Year
Shaping Mode: Injection Mould
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 5 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (20)
  • New Plastic Injection Drain Box Mould
  • New Plastic Injection Drain Box Mould
  • New Plastic Injection Drain Box Mould
  • New Plastic Injection Drain Box Mould
  • New Plastic Injection Drain Box Mould
  • New Plastic Injection Drain Box Mould
Find Similar Products

Basic Info.

Model NO.
J92015
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Plastic Material
HDPE
Process Combination Type
Single-Process Mode
Application
Garden Product
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
SGS
Standard
DME
Customized
Customized
After-sales Service
1 Year
Plastic Drain Box Mould
Plastic Catch Basin Mould
Transport Package
Wooden Box
Specification
DME
Trademark
JSLMOULD
Origin
Huangyan, Taizhou, China
HS Code
8480719090
Production Capacity
300 Sets/Per Year

Product Description

plastic injection drain box mould
Plastic material: PP OR HDPE
Mold Steel: 718 (34-38HRC)
Mould Standard: DME
Injection System: point gate
Ejector System: Ejector pin

High quality
Reasonable price
On time delivery
Good After-sale service
Strict quality control
All the mould are automotic.


JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:

1. Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C

- design checking (part design, mould design, mould engineering drawing)

- checking each part of mould's size after machining, according to 2D drawing

- mould testing(check mould running condition)

3. Check with customer's requirement again before mould shipping.

FAQ:
 
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.

2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.

3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.

4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.
New Plastic Injection Drain Box MouldNew Plastic Injection Drain Box MouldNew Plastic Injection Drain Box MouldNew Plastic Injection Drain Box MouldNew Plastic Injection Drain Box Mould

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
Product Groups
More