Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Still deciding? Get samples of US$ 30/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Injection plastic water camper mould |
Product material | PP/abs |
Core&Cavity Steel | 718 |
Steel hardness | HRC35-38 |
Mould Standard | DME |
Cavity Number | Single or Mutil |
Injection System | side gate/point gate/direct gate |
Ejector System | ejector pin |
Cycle Time | 30-40s |
Tooling lead time | 60 days |
Mould life | more than 500000SHOTS |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1.Samples/Drawing &Requirement from you |
|
2.Mould design:we will Communicate&Exchange the opinion with you after you place order. | |
3.Material Purchase:Steel cutting and Mould base tooling. | |
4.Assembling. | |
5.Inspection of mould : following and controlling the tooling processing. | |
6.Mould testing:We will inform you the date.Then will send the sample's inspection report&injection parameters with the sample to you! | |
7.Your instruction &confirmation for shipment. | |
8.Ready made mould before packing. |