| Product Name |
Injection Motorbike delivery box mould |
| Product material |
abs |
| Core& Cavity Steel |
718 |
| Steel hardness: |
HRC35-38 |
| Mould Standard |
DME |
| Cavity Number |
ONE |
| Injection System |
direct gate |
| Ejector System |
Ejector block |
| Cycle Time |
60s |
| Tooling lead time |
60 days |
| Mould life |
500, 000 times |
| Quality assurance |
ISO9001 |
| Our Advantage |
1. High quality |
| 2. Reasonable price |
| 3. On time delivery |
| 4. Good After-sale service |
| 5. Strict quality control |
| 6. All the mould are automotic. |
| Offer you |
In-time response on letters, telephone calls or fax |
| In-time supply the quotation and mould designs |
| In-time communication on the technical points |
| In-time sending pictures for the mould machining progress and mould finishing schedule |
| In-time mould test and sample delivery |
| In-time mould delivery. |
| For more information please contact us. |
| Processing |
Time |
| Prepare Steel |
5 days |
| CNC Machining |
10 days |
| Drill |
8 days |
| Heat treatment |
6 days |
| High speed CNC Machining |
7 days |
| Assembling and Fitting |
6 days |
| Polishing |
6 days |
| T1 mould test |
2 days |
Total: It is 50 Days for first mould testing after mold design is confirmed.
QUality control of Plasticmould
1.Mold Material Q/C
- Mold Steel Checking(Hardness, flaw detection)
- Mold Standard Spare Parts Checking(hardness, size, flaw checking)
2.Mold Making Process Q/C
- design checking (part design, mold design, mold engineering drawing)
- Each part of mold'S size checking after machining according to 2D drawing
- mold testing(check mold running condition)
3.Check with customer'S requirement again before mold shipping.