| Customization: | Available |
|---|---|
| Shaping Mode: | Injection Mould |
| Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Product Name | Experienced Quality Plastic Food Crisper Storage Container Box Mould |
| Product material | pp |
| Core& Cavity Steel | P20/718/2316/H13/s136ECT |
| Steel hardness: | HRC34-38 |
| Mould Standard | DME |
| Cavity Number | ONE |
| Injection System | Point GATE |
| Ejector System | EJECTOR PLATE |
| Cycle Time | 30 SECOND/SHOT |
| Tooling lead time | 60 days |
| Mould life | 500, 000 times |
| Quality assurance | ISO9001 |
| Our Advantage | 1. High quality |
| 2. Reasonable price | |
| 3. On time delivery | |
| 4. Good After-sale service | |
| 5. Strict quality control | |
| 6. All the mould are automotic. | |
| Offer you | In-time response on letters, telephone calls or fax |
| In-time supply the quotation and mould designs | |
| In-time communication on the technical points | |
| In-time sending pictures for the mould machining progress and mould finishing schedule | |
| In-time mould test and sample delivery | |
| In-time mould delivery | |
| For more information please contact us. | |
| Processing | Time |
| Prepare Steel | 5 days |
| CNC Machining | 10 days |
| Drill | 8 days |
| Heat treatment | 6 days |
| High speed CNC Machining | 7 days |
| Assembling and Fitting | 6 days |
| Polishing | 6 days |
| T1 mould test | 2 days |
| 1. Samples/Drawing & Requirement from you | |
| 2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
| 3. Material Purchase: Steel cutting and Mould base tooling. | |
| 4. Assembling. | |
| 5. Inspection of mould: following and controlling the tooling processing. | |
| 6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
| 7. Your instruction & confirmation for shipment. | |
| 8. Ready made mould before packing. |