Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Plastic Injection Washing Machine Part Mould |
Product material | ABS |
Core& Cavity Steel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME, etc |
Cavity Number | Single |
Injection System | side gate |
Ejector System | ejector pin+ejector cylinder |
mould base | S50C |
Cycle Time | 50S |
Tooling lead time | 60DAYS |
Mould life | 1, 000, 000SHOTS |
Quality assurance | ISO9001 |
Specification | According to client' s requirements |
Our Advantage | 1. High quality |
2. Reasonable price | |
3. On time delivery | |
4. Good After-sale service | |
5. Strict quality control | |
6. All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
plastic furniture mould |
|
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. | |
For more information please contact us. |