Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name |
China Professional Quality Plastic Baseball Helmet Mould |
Product material |
ABS |
Core&CavitySteel | 718 |
Steel hardness: | HRC34-38 |
Mould Standard | DME |
Cavity Number | 1*1 |
Injection System | direct gate |
Ejector System | ejector block |
mould base | S50C |
Cycle Time |
35S |
Tooling lead time |
60 DAYS |
Mould life | 500,000-1,000,000HOTS |
Quality assurance | ISO9001 |
Our Advantage | 1. High quality |
2. Reasonable price | |
3. On time delivery | |
4. Good After-sale service | |
5. Strict quality control | |
6. All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. |