Product Name |
Plastic Injection Water Filter Housing Mold |
Product material |
PP |
Core&Cavity Steel |
2738 |
Steel hardness: |
HRC35-38 |
Mould Standard |
DME |
Cavity Number |
2 |
Injection System |
Side gate |
Ejector System |
Stripper plate+Motor |
Cycle Time |
35'' |
Tooling lead time |
50days |
Mould life |
1000,000 times |
Quality assurance |
ISO9001 |
|
Our Advantage |
1.High quality |
2.Reasonable price |
3.On time delivery |
4.Good After-sale service |
5.Strict quality control |
6.All the mould are automotic. |
Main QC Procedure
mould design control
mould steel certificated
mould steel hardness inspection
mould steel electrodes inspection
mould core and cavity steel dimension inspeciton
mould pre assembly inspection
mould trial report and sample inspection
mould pre shipment trial inspection
export mould package inspection.
FAQ:
1.How about your quality control?
We have professional QC team to control mold quality from raw material,machining to the final mould testing parts,as we realize that quality control is the first priority to run business successfully,and the Quality is the life of enterprise.
2.What's your lead time?
For most mold,normally 45 to 60 working days ( not including Chinese official holidays ) after deposit received and mold drawings approved.
3.How to approval samples?
1) You can come to our factory to see the mold testing directly.
2) We could send samples by DHL, TNT, Fedex, and we can send mold running video and molding parts dimension inspection report to you by email.
4.What about your after service?
1 year under normal use procedure,Spare part which is non-man made damaged will be offered for free within one year, and you can contact us at any time if you need help.