Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Plastic Car Door Armrest Mold |
Product material | ABS |
Core&Cavity Steel | 2738/718/p20/2316 ECT |
Steel hardness: | HRC35-38 |
Mould Standard | DME/HASCO/Lkm ECT |
Cavity Number | ONE |
Injection System | Side Gate |
Ejector System | Ejector Pin |
Cycle Time | 60S |
Tooling lead time | 60DAYS |
Mould life | 500,000SHOTS |
Quality assurance | ISO9001 |
Our Advantage | 1.High quality |
2.Reasonable price | |
3.On time delivery | |
4.Good After-sale service | |
5.Strict quality control | |
6.All the mould are automotic. | |
Offer you | In-time response on letters, telephone calls or fax |
In-time supply the quotation and mould designs | |
In-time communication on the technical points | |
In-time sending pictures for the mould machining progress and mould finishing schedule | |
In-time mould test and sample delivery | |
In-time mould delivery. | |
For more information please contact us. |
Processing | Time |
Prepare Steel | 5 days |
CNC Machining | 10 days |
Drill | 8 days |
Heat treatment | 6 days |
High speed CNC Machining | 7 days |
Assembling and Fitting | 6 days |
Polishing | 6 days |
T1 mould test | 2 days |
1. Samples/Drawing & Requirement from you | |
2. Mould design: we will Communicate& Exchange the opinion with you after you place order. | |
3. Material Purchase: Steel cutting and Mould base tooling. | |
4. Assembling. | |
5. Inspection of mould: following and controlling the tooling processing. | |
6. Mould testing: We will inform you the date. Than will send the sample' s inspection report& injection parameters with the sample to you! | |
7. Your instruction & confirmation for shipment. | |
8. Ready made mould before packing. | |