Product Name Plastic Helmet Mould
Product material ABS
Core&Cavity Steel 718
Steel hardness: 35-38
Mould Standard DME
Cavity Number 1
Injection System POINT GATE
Ejector System Ejector Block
Cycle Time 60S
Tooling lead time 60DAYS
Mould life 1, 000, 000SHOTS
Quality assurance ISO9001
Our Advantage
1. High quality
2. Reasonable price
3. On time delivery
4. Good After-sale service
5. Strict quality control
6. All the mould are automotic.
Offer you In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery.
For more information please contact us.
Product Name |
Plastic helmets mould |
Plastic material |
ABS |
Core&Cavity Steel |
718 |
Steel hardness: |
HRC34-38 |
Mould Standard |
DME |
Cavity Number |
single |
Injection System |
point gate |
Ejector System |
Block |
Cycle Time |
60 seconds/shot |
Tooling lead time |
60 days |
Mould life |
500,000 times |
Quality assurance |
ISO9001 |
|
JSL Mould Quality Control
For the Q/C of mould, there are 3 steps:
1. Mould Material Q/C
- Mould Steel Checking(Hardness, flaw detection)
- Mould Standard Spare Parts Checking(hardness, size, flaw checking)
2. Mould Making Process Q/C
- design checking (part design, mould design, mould engineering drawing)
- checking each part of mould's size after machining, according to 2D drawing
- mould testing(check mould running condition)
3. Check with customer's requirement again before mould shipping.